What can you use standard heuristics in Advanced Planning (PP/DS) for?

  • A. To set default values in production master data
  • B. To optimize costs and times in production plans
  • C. To solve planning problems for defined objects
  • D. To automate material movements in material staging

Answer: C


NEW QUESTION # 21
What is the purpose of using a low level code?
Note: There are 2 correct answers to this question.

  • A. To determine the use of subitems inside the material BOM (bill of material)
  • B. To determine the priority of alternative components inside the material BOM (bill of material)
  • C. To determine the lowest explosion level at which a material occurs in all the product structures
  • D. To determine the sequence in which materials are planned in MRP

Answer: C,D


NEW QUESTION # 22
What is the purpose of the pull list in material staging?

  • A. To control the flow of material from the central storage location to the production storage location
  • B. To control the flow of material from the supplier to the production storage location
  • C. To control the flow of material from the production storage location to the central storage location
  • D. To control the flow of material from the supplier to the central storage location

Answer: A


NEW QUESTION # 23
Which of the following is a scheduling method for a production order?

  • A. Key date scheduling
  • B. Determination of basic dates
  • C. Determination of delivery date
  • D. Lead time scheduling

Answer: D


NEW QUESTION # 24
Advanced Planning uses data from SAP S/4HANA Cloud Private Edition. In which master data objects can you set the Advanced Planning flag?
Note: There are 2 correct answers to this question.

  • A. Work center
  • B. Material
  • C. Plant
  • D. Production version

Answer: A,B


NEW QUESTION # 25
How do you model a production line in repetitive manufacturing?

  • A. As a routing
  • B. As a work center
  • C. As an operation
  • D. As a resource network

Answer: B


NEW QUESTION # 26
Which of the following elements does MRP take into account during net requirement calculation?
Note: There are 2 correct answers to this question.

  • A. Production orders
  • B. Planned orders (firmed)
  • C. ATP quantities
  • D. Planned orders (unfirmed)

Answer: A,B


NEW QUESTION # 27
What does Consumption-based Planning use to determine requirements in the future?
Note: There are 3 correct answers to this question.

  • A. Planning file entries
  • B. Historical values
  • C. Dependent requirements
  • D. Forecasting
  • E. Statistical procedures

Answer: B,D,E


NEW QUESTION # 28
How can you limit the validity of a bill of material (BOM)?
Note: There are 2 correct answers to this question.

  • A. By material status
  • B. By plant
  • C. By material type
  • D. By change number

Answer: B,C


NEW QUESTION # 29
Which objects can you change with a change number?
Note: There are 2 correct answers to this question.

  • A. Bill of material
  • B. Production order
  • C. Routings
  • D. Work center

Answer: A,C


NEW QUESTION # 30
You are trying to create a production order and no valid production version can be selected. What could be the reasons?
Note: There are 2 correct answers to this question.

  • A. No production lines are assigned to the production versions.
  • B. No bills of material (BOMs) are assigned to the production versions.
  • C. The order lot size is NOT within the validity range of a production version.
  • D. The basic start date is NOT within the validity period of the production version.

Answer: C,D


NEW QUESTION # 31
Why would you use phantom assemblies?
Note: There are 2 correct answers to this question.

  • A. To enable simple structuring of BOMs
  • B. To make the procurement easier
  • C. To reduce the number of material masters
  • D. To make the assignment of components easier

Answer: A,D


NEW QUESTION # 32
You are a consultant on an SAP S/4HANA Cloud greenfield project.
Which of the following aspects should you focus on to achieve and maintain clean core data quality? Note: There are 2 correct answers to this question.

  • A. Efficiency
  • B. Accuracy
  • C. Stability
  • D. Timeliness

Answer: A,C


NEW QUESTION # 33
What is the focus of repetitive manufacturing?

  • A. Production of lot size one
  • B. Detailed tracking of production orders
  • C. Low volume production
  • D. Period and quantity-oriented production

Answer: D


NEW QUESTION # 34
What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement?

  • A. The MRP run starts with external procurement.
  • B. The MRP run does NOT consider the material; it has to be planned interactively.
  • C. The MRP run starts with in-house production.
  • D. The MRP run plans the material only if a quotation has been maintained.

Answer: C


NEW QUESTION # 35
You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?

  • A. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator
  • B. Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator
  • C. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator
  • D. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator

Answer: B


NEW QUESTION # 36
......